MANAJEMEN RISIKO BAHAYA BERBASIS HIRADC PADA PEKERJAAN INTAKE IRIGASI KANAN PROYEK BENDUNGAN KARANGNONGKO PAKET 2
Abstract
ABSTRACT
The risk of work accidents in a construction project is very high so risk management is necessary. This research aims to identify potential hazards, assess the level of risk, and develop risk control measures in the right irrigation intake work of the Karangnongko Dam Project Package 2 using the HIRADC method. The research method used a qualitative approach with data collection techniques through field observations, in-depth interviews, and distributing questionnaires to 10 experts. Risk analysis was conducted using severity index based on AS/NZS 4360:1999 matrix. The results showed the identification of 151 risk variables from 12 work items with a distribution of: 27.15% extreme risk, 36.42% high risk, 20.53% medium risk, and 15.98% low risk. The dominance of high and extreme risk categories (63.57% combined) indicates the need to implement a strict risk control system to achieve the zero accident target.
Keywords: construction safety, dams, HIRADC, irrigation intakes, risk management
Full Text:
PDF (Bahasa Indonesia)References
H. A. A. Rohim, “Pembangunan Infrastruktur Dorong Pertumbuhan Ekonomi Indonesia,” Kementerian Sekretariat Negara Republik Indonesia. Accessed: Dec. 18, 2024. [Online]. Available: https://www.setneg.go.id
N. Joga, A. Rinaldy, and H. H. Sahid, Melestarikan Air, Merawat Kehidupan, & Mewujudkan Kemakmuran, 3rd ed. Jakarta Selatan: Kementerian Pekerjaan Umum dan Perumahan Rakyat, 2024. Accessed: Dec. 11, 2024. [Online]. Available: https://sda.pu.go.id/
Waskita-Bangkit-Infra KSO, “Rencana Keselamatan Konstruksi (RKK) Pelaksanaan Pembangunan Bendungan Karangnongko di Kabupaten Bojonegoro, Provinsi Jawa Timur dan Kabupaten Blora, Provinsi Jawa Tengah Paket 2,” Oct. 2023.
E. Noerhayati and B. Suprapto, Perencanaan Jaringan Irigasi Saluran Terbuka. Inteligensia Media, 2018.
S. Aisyah, A. Rokhmawati, and I. S. Ingsih, “Analisis Risiko Kecelakaan Kerja Pada Pelaksanaan Pekerjaan Maindam Bendungan Jragung Kabupaten Semarang Menggunakan Metode Bowtie,” Jurnal Rekayasa Sipil, vol. 11, no. 1, pp. 11–20, Feb. 2025.
ISO 31000:2018, “Risk Management Guidelines,” 2018.
H. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 2017.
A. P. Putra, “Studi Analisis Manajemen Risiko Kesehatan dan Keselamatan Kerja (K3) pada Pelaksanaan Proyek Konstruksi Rehabilitasi Bangunan Rumah Susun Sombo Blok E Kota Surabaya,” 2024, Accessed: Dec. 11, 2024. [Online]. Available: http://repository.unisma.ac.id/handle/123456789/9744
M. R. Jannah, “Analisis Risiko Keselamatan dan Kesehatan Kerja (K3) Melalui Pendekatan HIRADC dan Metode Job Safety Analysis Pada Studi Kasus Proyek Pembangunan Menara X di Jakarta,” 2017.
A. Prabowo, N. B. Revantoro, and C. P. Dewi, “Decision Analysis on Implementation of Priority Care and Maintenance due to Potential Damage at Alfamidi Minimarket in Malang Using The AHP Method,” Journal Innovation of Civil Engineering (JICE), vol. 4, no. 1, pp. 28–36, 2023.
Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan R&D. 2010.
H. W. Heinrich, Industrial Accident Prevention: A Scientific Approach. 1959.
Refbacks
- There are currently no refbacks.
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)