Studi Peningkatan Lapis Tambah (Overlay) Ruas Jalan Wonorejo – Jember – Sumberjati - Bts. Kabupaten Banyuwangi Km. 221+000 S/D Km. 231+000

Fajrotul Malikhah, Bambang Suprapto, Azizah Rachmawati

Abstract


Increased community mobility on the Wonorejo - Jember - Sumberjati - Bts road section. Regency Banyuwangi which is the main road connecting Lumajang Jember to Banyuwangi from year to year has experienced a sharp increase. Likewise with road conditions whose damage cannot be tolerated anymore, because of the rate of population growth and changes in people's lifestyles to own their own vehicles, this has an impact on the dense volume of vehicles, plus the cross-border roads that are not wide. So to restore comfort and strength to the road, one alternative that can be used is the addition of a re-layer on the road (overlay). Focus on writing this thesis regarding flexible pavement. The final results obtained in the calculation of this final project in the discussion about increasing the volume of the road for ten years is 8,103,003 ESA, in the calculation of road coating or the addition of new asphalt 1 = 7 cm; 2 = 6 cm; 3 = 7 cm; 4 = 15 cm; 5 = 9 cm; 6 = 11 cm; 7 = 12 cm; 8 = 11 cm; 9 = 13 cm; 10 = 14cm. With the calculation of H = 0.6 m b = 0.5 m is a channel planning system formed in the form of a test

 

Keywords : flexible pavement

Full Text:

PDF

References


(1) Alamsyah, A,A, Edisi Revisi (2006), Rekayasa Jalan Raya, Penerbit Universitas Muhamadiyah Malang

(2) Pranowo, H.C dkk, (2004), Pd T-18-2004-B Penentuan Klasifikasi Fungsi Jalan di Kawasan Perkotaan, Departemen Permukiman Dan Prasarana Wilayah

(3) Santoso, Singgih, (2014), Statik Parametrik Konsep dan Aplikasi dengan SPSS, Penerbit Elex Media Komputindo, Jakarta

(4) Usman, Husain, (2012), Pengantar Statistika Edisi kedua, Penerbit Bumi Akasara, Jakarta


Refbacks

  • There are currently no refbacks.