ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN MENGGUNAKAN METODE IMPORTANCE PERFORMANCE ANALYSIS (IPA) PADA PEMBANGUNAN GEDUNG RISET DAN INOVASI FILKOM UNIVERSITAS BRAWIJAYA
Abstract
ABSTRACT
Construction projects are temporary activities and require careful planning regarding time, costs, labor, and equipment. Project delays occur when work completion exceeds the schedule stated in the contract, which can lead to budget waste, the emergence of conflicts, and a decrease in the quality of work results. This study examines the factors that caused delays in the Construction Project for the Research and Innovation Building, Faculty of Computer Science, Universitas Brawijaya Phase 1, which experienced a time deviation from the initial plan. Based on interviews with related parties, it was found that the most dominant factor triggering the delay was the lack of equipment availability, followed by unfavorable weather conditions. Meanwhile, aspects of materials, labor, and management only had a relatively small impact. These findings are expected to serve as a reference for the evaluation and improvement of project management in similar projects in the future.
Keywords : Project delays, Construction management, Research and Innovation Building, IPA, SPSS
Full Text:
PDF (Bahasa Indonesia)References
Ridwan, A. (2020). Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Jam Kerja Empat Jam Dan Sistem Shift Kerja (Studi Kasus: Proyek Pembangunan Gedung Rsub Malang). Jurnal Aplikasi Pelayaran Dan Kepelabuhanan, 11(1),
Rumampuk, S. S. W. (2019). Analisis Faktor-Faktor Penyebab Keterlambatan Pada Pembangunan Puskesmas Aertembaga Kota Bitung. Jurnal Ilmiah Realtech, 15(2), 129–137.
Saefudin, R., Mulyadi, L., Iskandar, T., & Wulandari, L.K. (2021). Kerangka Acuan Kerja Merupakan Bagian Penting Yang Mempengaruhi Keterlambatan Kerja Pada Proyek Pembangunan Dom Unisma. Infomanpro, 10(2), 1–10.
Lestari, I. G. A. A. I., Pradnyadari, N. L. M. A. M., & Dewi, N. P. I. C. (2022). Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Di Kabupaten Badung. Widya Teknik, 17(01), 19–26.
Kurniawan, N. A., & Febrianti, A. (2022). Usulan Peningkatan Kualitas Pelayanan Trans Shuttle Menggunakan Metode Importance Performance Analysis (Ipa).
Refbacks
- There are currently no refbacks.
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)