PENGENDALIAN WAKTU DAN BIAYA PADA PROYEK PEMELIHARAAN BERKALA/PENINGKATAN RUAS JALAN KABUPATEN PROBOLINGGO MENGGUNAKAN EARNED VALUE ANALYSIS

Ricky Dwi Wahyudi, Anang Bakhtiar, Aasniari Aasniari

Abstract


                     ABSTRAK

The project of periodic maintenance/improvement of roads is an activity aimed at maintaining the performance of road sections to remain optimal in accordance with service standards. The Kotaanyar–Pakuniran road section in Probolinggo Regency is the object of research in this study. This study aims to analyze the time and cost performance of the project using the Earned Value Analysis (EVA) method. The EVA method is used to assess work progress compared to the plan and to review the appropriateness of costs incurred during project implementation. The analysis results show that time performance declined in weeks 3 to 4, when work progress fell behind schedule. However, this condition was recovered so that in week 10, the schedule performance value returned to the planned target. In terms of cost, the project showed efficient performance, marked by a positive cost analysis value from week 3 to the end of the work, which means that the actual cost was lower than the work value. Overall, the EVA analysis results confirm that the project can be completed on time with good cost efficiency.


References


Nanda P & Dofir, (2021). Analisis Pengendalian Biaya dan Waktu pada Proyek Pemeliharaan Trotoar jalan di Provinsi DKI Jakarta (Trotoar Pasar Rebo) Menggunakan Metode Earned Value.

Bakhtiar, A. (2019). Penilaian Pengendalian Biaya Dan Waktu Pada Proyek Peningkatan Jalan Menggunakan Metode Earned Value. Teras Jurnal: Jurnal Teknik Sipil, 8(2), 401. https://doi.org/10.29103/tj.v8i2.172

Octafiani, L. (2019). Analisis Nilai Hasil (Earned Value Analysis) Terhadap Pengendalian Biaya Dan Waktu Pembangunan Gedung (Studi Kasus Pembangunan Gedung Type B (Gedung Wanita Kalibokor). Journal of Chemical Information and Modeling, 53(9), 1689–1699.

Ervianto, W. I., & Widodo, N. (n.d.). (1998) Kesuksesan Proyek Di Daerah Istimewa Yogyakarta (Sudut Pandang Kontraktor). 44, 1–9.

AJDP Halawa. (2023). Analisi Kinerja Waktu dan Biaya Pada Proyek Pembangunan Gedung Sekolah Minggu Resort Aek Kanopan Kabupaten Labuhan Batu Utara Dengan Menggunakan Metode Earned Value. Jurnal Teknik Sipil: Vol 2, Universitas Harapan Medan.

Soemardi, B. W., Wirahadikusumah, R. D., Abduh, M., & Pujoartanto, N. (2006). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi. Institut Teknologi Bandung, 1–13. https://www.academia.edu/2979947/Konsep_Earned_Value_untuk_Pengelolaan_Proyek_Konstruksi


Refbacks

  • There are currently no refbacks.