STUDI ALTERNATIF PERBANDINGAN PONDASI TIANG PANCANG DAN BORE PILE DENGAN VARIASI DIMENSI PADA GEDUNG RUMAH SAKIT MULIA SANTOSO MEDIKA BULULAWANG
Abstract
ABSTRACT
In planning a multi-storey building, it is necessary to consider and consider the safety, strength, and efficiency of the plan in resisting the plan load and the forces received. Mulia Santoso Medika Hospital building has sandy soil characteristics. Based on the investigation and soil characteristics that have been carried out, the foundation used for the construction of the building is a deep foundation with bore piles. In this study, researchers will compare the efficiency of the existing foundation, namely bore pile foundation with pile foundation. From the analysis results, the bearing capacity of a pile with a diameter of 0.5 on a pile is (Qg) 518.402 tons requiring 2 piles and a budget of Rp. 14,664,223, then compared to a bore pile, namely (Qg) 664.753 tons requiring 3 piles and a budget of Rp. 22,461,679.
ABSTRAK
Dalam merencanakan sebuah gedung bertingkat, perlu diperhatikan dan dipertimbangkan faktor keamanan, kekuatan, dan efisiensi rencana dalam menahan beban rencana dan gaya-gaya yang diterima. Gedung Rumah Sakit Mulia Santoso Medika memiliki karakteristik tanah berpasir. Berdasarkan penyelidikan dan karakteristik tanah yang telah dilakukan, pondasi yang digunakan untuk konstruksi gedung tersebut adalah pondasi dalam dengan tiang bor. Pada penelitian ini, peneliti akan membandingkan efisiensi pondasi yang sudah ada, yaitu pondasi bore pile dengan pondasi tiang pancang. Dari hasil analisis, daya dukung tiang dengan diameter 0,5 pada tiang pancang adalah (Qg) 518,402 Ton membutuhkan 2 tiang dan anggaran biaya sebesar Rp14,664,223, kemudian dibandingkan dengan bore pile yaitu (Qg) 664,753 Ton membutuhkan 3 tiang pancang dan anggaran biaya sebesar Rp22,461,679.
Full Text:
PDF (Bahasa Indonesia)References
Harviani, G. L., Warsito, & Suprapto, B. (2021). Studi Alternatif Perencanaan Shearwall Sebagai Struktur Penahan Gempa Pada Gedung Apartement Begawan Malang. Jurnal Rekayasa Sipil, 9.
Kamal, M., Warsito, & Suprapto, B. (2019). Studi Perencanaan Struktur Dengan Sistem Ganda (Dual System) Untuk Menahan Beban Lateral Pada Pembangunan Gedung Pasca Sarjana Universitas Islam Malang. Jurnal Rekayasa Sipil.
Rudiansyah, A., Suprapto, B., & Bakhtiar, A. (2018). Studi Perencanaan Struktur Akibat Penambahan Shearwall Pada Gedung Asrama Balai Teknik Air Minum Dan Sanitasi Wilayah Ii Provinsi Jawa Timur. Jurnal Rekayasa Sipil.
Sephanie, D., Warsito, & Suprapto, B. (2020). Studi Perencanaan Alternatif Gedung Laboratorium Terpadu Dengan Metode Komposit Universitas Jember. Jurnal Rekayasa Sipil.
Tri Putra Herdianto, R., Warsito, & Suprapto, B. (2018). Studi Perencanaan Struktur Arnava Hotel Dan Apartemen Dengan Metode Baja-Beton Komposit. 6.
Refbacks
- There are currently no refbacks.
© 2023 Rekayasa Sipil. All rights reserved.
Email: sipil@unisma.ac.id | Telp: 0341551932
1.jpg)
.jpg)
.jpg)
1.jpg)
1.jpg)
1.jpg)
1.jpg)
1.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)

